The
PLM Debate
As
part of our ongoing research programme, Cambashi is running a debate
on product lifecycle management (PLM) and how it interfaces with
the supply chain. This is the second article in a series of threads,
a version of which was first published in Engineering Automation
Report in October 2002.
Is PLM applicable to AEC?
Industrial users tell us that once they master
their CAD tools to capture and document designs the next step is
to automate the flow of design information through their enterprise
and its business partners. This has become the next white-hot application
hope for packaged software vendors - PLM.
When we ask users what they mean by automating
the flow of design information we get a wide variety of answers.
This may be because different users have different starting points
on what are often huge projects. Alternatively there could be real
differences between users. That would mean that PLM is a software
project business where system integrators build applications on
top of tools supplied by software vendors and not a packaged software
business.
When we reviewed the Product Lifecycle Management
(PLM) case studies in our library we found that the vast majority
were from discrete manufacturing. Discrete manufacturing is only
a fraction of all industry. This article explores the case for users
to consider the same tools in an industry sector about the same
size -Architecture, Engineering and Construction (AEC).
One thing is clear in the current climate. As,
SAP said at the recent SAPPHIRE conference, the only acronym that
matters today is ROI - Return on Investment. It is the job of consultants
and suppliers to propose applications solutions that fit the business
problem not the job of prospective users to try to figure out how
the acronymic technology will do something for them. So to make
the case for PLM in AEC we need to look at industry structure and
business drivers.
The AEC market covers the design, building, operation
and maintenance of infrastructure assets. Just as it is larger discrete
manufacturing users who are the PLM pioneers we expect that it will
be large scale engineering projects such as office blocks, sports
stadia, new highways, utility networks rather than residential developments
who will adopt PLM in AEC. The industrial structure differs to discrete
manufacturing industry:-
There are service providers who design and build infrastructure
projects for owner operators to use. Many projects have sufficient
impact on the environment to generate public interest in the project.
The
key production unit is a single project rather than a series production
of products.
Several
companies come together on a more or less equal basis to contribute
to each project rather than an Original Equipment Manufacturer (OEM)
like Ford organising the whole industry chain. Ironically, some
discrete manufacturers have similar ambitions to create "instant
consortia" to avoid owning manufacturing or design assets that
are not core to their business.
Within
the service providers there are many different disciplines involved:
architecture; civil engineering; structural engineering; construction
economists; electrical engineering; heating and ventilation engineering;
etc.
The
owner operators such as transportation agencies, property developers,
utilities and the government who will use the facility in its life
are quite varied and their optimum use of the facility will be equally
varied.
Large infrastructure projects therefore typically
involve a number of "stakeholders" - groups with an interest
and involvement with the design data. The handover from the service
providers who design and build the project to the owner who will
operate and manage the structure is analogous to the sale of a discrete
manufacturer's product to its final user. Just as in discrete manufacturing
the design locks in the cost of the product and project, the cost
of owning and operating the structure is locked in by the design.
Infrastructure lasts for a long time. It will be reworked and renovated
several times. These costs dominate the total lifecycle cost. The
final user tends to have more interest in the design data than a
typical product user. They have operational cost savings that are
not addressed by other enterprise applications. This might mean
more - and longer-term interest - in design information and a better
justification for PLM in AEC.
The AEC world is changing fast, generating new
business drivers for AEC companies to respond to:-
There
is a trend away from public to joint public and private financing
of infrastructure. The emphasis changes from optimising the first
cost to optimising the lifecycle cost. This introduces the need
for more efficiency in design and operation of the project with
even more accurate monitoring and control.
Utilities
and telecommunications companies, some of the biggest infrastructure
owner operators, are going through unprecedented change. After all
the mergers, acquisitions, disposals and business failures we will
still be served by price regulated monopoly elements of these businesses.
In the last analysis they have the need to compete by working assets
harder.
The
world-wide environmental lobby is having an increasing impact. Approval
is more difficult to obtain and more of the community is active
in reviewing and monitoring infrastructure projects.
By
definition, construction is a local business. However, major infrastructure
projects use international consortia to develop the intellectual
property as the norm. Now this is extending to design re-use and
the off-site assembly of sub-units.
A
lot of time is wasted on a construction site as events destroy the
production plan made at the beginning of the day. The advent of
cell phones and PDAs capable of receiving data means we can now
re-plan reach and inform individuals all over the construction site
how to deal with exceptions.
Our conclusion is that there is a big opportunity
for PLM in AEC. However, the AEC lifecycle is different, the stakeholders
are different, the drivers are mostly different. The applications
and the economic justification for paying for design data are therefore
going to be different. We see the need to differentiate between
PLM for discrete manufacturing and PLM for AEC. Since P could be
project or product we have invented a new acronym (sorry folks)
Infrastructure Lifecycle Management or ILM. The extra bad news is
that we've begun to look at Consumer Packaged Goods industries like
Food and Drink and process industries like steel and textiles. They
too are different! Please email me with your suggested acronyms!
The compelling case for the AEC industry is for
users to look at their own business needs and identify where the
applications can make a difference. In the long run, ILM and PLM
will probably share the same infrastructure tools. However, today
we recommend looking for tactical projects with short term pay backs.
Mike
Evans
email:mike.evans@cambashi.com
back to top
If you have any feedback
to add to this debate, please email plm@cambashi.com
with the subject "PLM debate".
|